Feedback Site map Russian version Czech version
E-booklet
Information about TVEL Corporation
 
Quality of production
RBMK reactor fuel

The RBMK-1000 and RBMK-1500 fuel assemblies with burnable poison are made of zirconium alloys. Their life is up to 8 years to ensure nuclear safety and good economics. RBMK-1000 fuel assemblies widely use the recovered nuclear fuel.

Learn more

TVEL Fuel Company Address:
49 Kashirskoe shosse,
Moscow 115409
Tel.: +7 495 239-49-22,
+7 495 988-8282 (commutator)
Fax: +7 495 988-8383 ext. 6956
E-mail: info@tvel.ru  

Home TVEL Fuel Company TVEL Fuel Company
Structure

Printable version

Nuclear fuel cycle

Nuclear fuel cycle is a combination of techniques for mining uranium, nuclear reactor fuel production and preparing the fuel for the use and after-use disposal. The notion “fuel cycle” specifies the fact that spent or irradiated nuclear fuel (SNF) can be regenerated after special treatment. The nuclear fuel cycle, including ultimate disposal of high-level waste, takes generally 50 to 100 years.

Nuclear power fuel cycle can be divided into three phases. The initial phase covers uranium ore mining through supply of fabricated fuel assemblies to NPP sites. The next phase includes reactor operation to generate electricity and temporary store SNF at NPP site. The final phase includes several operations: irradiated fuel transportation to a special storage facility or SNF reprocessing plant and burial of vitrified high-level waste after reprocessing.

Learn more

Copyright © 2005 JSC TVEL
All rights reserved.
Legal notice
Terms of Use

webmaster@tvel.ru